Rehabilitation of the Muaizila Dam with a storage capacity of 10 million cubic meters to enhance rainwater harvesting in the Deir ez-Zor countryside
Syrian Governance Brief & Institutional Update
Rehabilitation of the Maizila Dam with a storage capacity of 10 million cubic meters to enhance rainwater harvesting in the Deir ez-Zor countryside. The Water Resources Directorate in Deir ez-Zor completed maintenance and rehabilitation work on the Maizila Dam in the desert, after about 15 years without comprehensive maintenance. With the aim of increasing its readiness to receive rainwater and floods and maintaining its structural integrity. The works included maintaining the dam body, manholes and gates, and treating cavities. This enhances its efficiency in retaining and storing water, and reduces the risk of leakage. The dam's storage capacity is 10 million cubic meters, which allows for the benefit of rainwater during times of drought, providing a water source for the people of the desert and livestock breeders, supporting their stability and protecting their livestock, in addition to reducing the risks of torrents and floods. The Ministry of Energy thanks the engineering, technical and labor cadres in the Water Resources Directorate in Deir ez-Zor for their efforts in rehabilitating the dam and raising its readiness. This enhances the benefit of water resources and improves living conditions in the desert regions. #Syrian_Arab_Republic #Ministry_of_Energy
Official Syrian decrees and regulatory authority verified full text.

